| The transport task analysis of many major mining and agricultural projects has not attracted the attention it deserves. If it's not a pipeline or conveyor system project engineers consider it some one else's problem. This results in a grab bag of old trucking costs and assumptions that give operational managers many sleepless nights trying to justify maintenance costs that have gone through the roof. Fleet engineers know through experience that an incorrectly specified engine, transmission and trailer combination will send a fleet operator to the wall. Smith Resources International Pty Ltd have the connections and experience to provide optimal solutions to any road transport task on public and private road systems. |

| Finite Element Analysis of Large Scale Designs permits the fine tuning of profiles to maximze strength to weight ratios. |
| SRI completed a study of the transport and logistical problems associated with the Phitsanulok Sugar Mill in Thailand in May 1996 for the TRR Group of Companies |
| SRI designed and tested a copper anode cassette for location on road and rail wagons to the specifications of the Queensland Rail MRE group in 1998. |
| SRI did a forensic engineering analysis of a series of tip body truck failures supplied to Freeport Mine in Irian Jaya by Western Star Trucks of Canada in 1999 |
| SRI completed a series of Finite Element Analysis of Pressure Tank designs to minimise tare weight for semi trailers and B Double tankers manufactured by Bulk Pressure Tankers of NSW in 1996, 97 and 2001. |
| SRI completed a weekend SWOT analysis for the business plan team of the Future Office Group in 2000 |
TOP OF PAGE
HOME